Haranga: June 2012 Quarterly Activities Report


July 26, Haranga Resources Limited (ASX:HAR) --

- Highlights -

Exploration Activity

• Outstanding results obtained from the metallurgical test work thus far completed at the Selenge Iron Ore Project.

• Comprehensive Davis Tube Recovery (DTR) test program revealed that all three Selenge deposit/prospects thus far drilled can consistently produce magnetite concentrate at an average grade of over 65% Fe with low levels of contaminants.

Summary DTR Results – Average Conc Quality from all Iron Zones

(80% passing 75µm, 10% yield cutoff)











Deposit


Average Mass Yield


Fe (%)


SiO2 (%)


Al2O3 (%)


S (%)


P (%)


Bayantsogt


29.1%


65.77


3.25


0.96


1.03


0.02


Prospects




















Dund Bulag


18.0%


65.15


5.34


1.32


0.18


0.00


Huiten Gol


29.8%


68.78


1.90


0.41


0.01


0.01





• Even the lower grade ore at Selenge is upgradable to a top quality concentrate justifying a significant price premium.

• The 75µm grind employed may not be necessary to achieve a saleable concentrate and DTR tests will be conducted at even coarser grind sizes.

• The 2012 drill program has commenced, with seven diamond core rigs now actively drilling at Selenge.

Corporate Activity

• Mongolia passed a Foreign Investment Law that provides for a Government approval process for significant change of control transactions in the minerals sector.

• Marshall Cooper, a nominee of the Lippo Group, has joined the Company's board.

• The Company maintains a cash position of $15 million.



Link to report

Link to Quarterly Cash Flow Report

0 Response to "Haranga: June 2012 Quarterly Activities Report"

Post a Comment

Iklan Atas Artikel

Iklan Tengah Artikel 1

Iklan Tengah Artikel 2

Iklan Bawah Artikel